skip to main
|
skip to sidebar
GROUP 40 - Music Video 2009/10
LongRoadMedia
home
about
contact
Thursday, 22 October 2009
Filming update
So far we are quite pleased with the footage we have and have edited some of it quite well. Sadly our rough cut won't be ready on time, due to situations beyond our control.
Newer Post
Older Post
No response to “Filming update”
Leave a response
|
Comments (Atom)
Leave a reply
Go Back The The Main
MUSIC VIDEO BLOG
Label Cloud
Cy
(6)
Fred
(11)
FRed Josh B Josh I Cy
(24)
Fred.
(1)
Josh B
(6)
Josh I
(10)
osh
(1)
Si
(1)
The Don
(1)
Blog Archive
▼
2009
(43)
►
December
(9)
►
November
(20)
▼
October
(8)
Thoughts about our Rough Cut
Rough Cut
Things that we still have to film
Filming update
Ed Lovelace
Lyrics
Test Footage
Group Picture
►
September
(5)
►
June
(1)
© 2009
GROUP 40 - Music Video 2009/10
. All Rights Reserved | Powered by
Blogger
Design
by
psdvibe
|
Bloggerized
By
LawnyDesignz
No response to “Filming update”
Leave a reply